NEXT EVENT: SATURDAY 7th FEB 2026: THE HISTORY OF OUR VILLAGE AND ITS VILLAGE HALL
Support Rowledge Village Hall with the 100 Club!
Donate to support our Hall and win prizes!
SPECIAL EVENT
The History of Our Village &
Its Village Hall
Come and see your village as you’ve never seen it before!
The profit from every ticket sold will go towards the 2026 appeal for funds to complete the new Rowledge Village Hall.
Tickets available online from Monday 22nd December 2025. A small booking fee applies. Also available in person at Friday morning Coffee Sport gatherings (cash or card)
When? Saturday 7th February 2026
Tickets £20, Doors open 6.30pm, Talk starts by 7.30pm
The event includes a warm meal in the interval, followed by a generous cheeseboard & coffee/tea.
The bar will be open serving beer, wine and soft drinks. Cards or cash welcome
New Village Hall Photo Updates
Foundation Raft
The foundation was completed on Christmas Eve (24/12/25)
Concete
Concrete being poured – 120m3 of it (23/12/25)
Laser Sightings
Laser-sightings being used to affirm height of concrete (23/12/25)
Reinforcement Steels
Reinforcement Steels in place, awaiting concrete (17/12/25)
Insulation
Underslab insulation being laid around the pile-caps, ready for the reinforced concrete slab to be poured (11/12/2025)
Reinforced Piles
Some of the reinforced piles which go down to 13m deep, upon which the reinforced-concrete foundation will be laid. (02/12/2025).
The Reinforced-concrete Piles
The tops of reinforced-concrete piles, ready for cutting down to the correct levels. (28/11/2025).
300mm of Crush and Run
300mm of Crush and run being laid over Teram matting, the area for contractors vehicle parking. (28/11/2025).
Piling Rig
The piling rig and concrete-pumping lorry getting ready to leave site (28/11/2025).
Site Office Arrival
O&D, the main contractor, brings in a site office, canteen and Drying Shed. (11/11/2025).
Crush and Run Layer
Progress showing a layer of “Crush and Run” levelled over the area on which the new building will sit. (11/11/2025)
First On-Site Tasks
Diverting the existing sewer around the Hall’s footprint. (Nov 2025).